Large-Scale Waste Sorting Facility Construction Project

This case study describes how an HT4014 telehandler and an FD40-RT rough terrain forklift support the construction of a large-scale waste sorting facility, where steel framing, sorting line equipment and building materials must be moved and positioned across an active build site. By combining telescopic lifting with dependable rough terrain forklift transport, the machines help the construction team handle heavy loads safely and keep the project moving forward.
Industry / Application:
Waste Management & Recycling Facility Construction
Equipment Model(s):
1 × HT4014 Telehandler (4 Ton, 14 m Lift Height, Forks + Material Bucket Attachment) 1 × FD40-RT Rou

Customer & Project Background:

In the construction of a large-scale waste sorting facility, an HT4014 telehandler and an FD40-RT rough terrain forklift are used to move structural steel, sorting equipment components and building materials across the site. The machines support the build from foundation work through equipment installation, helping the project team maintain a steady construction pace.

With a 4 ton capacity, 14 m lift height on the telehandler and dependable rough terrain mobility on the forklift, the two machines cover different handling needs across the site, from high-reach steel placement to ground-level material transport.

Project Background

The project involves building a material recovery facility designed to receive, sort and process large volumes of mixed waste. The facility includes a main processing hall, sorting lines, storage bays and an outdoor material yard.

Construction activities span structural steel erection, wall panel installation, conveyor system setup and yard paving, all coordinated across a large open site with multiple active work zones.

Challenges

The site required lifting heavy steel beams, trusses and equipment modules to significant heights during structural erection, demanding a machine with strong reach and stable lifting capacity.

Uneven ground conditions and loose construction debris across the site made maneuverability and traction a priority for daily material transport.

Multiple contractors working simultaneously on different building sections meant equipment needed to move materials quickly between zones without disrupting other trades.

Delivering palletized materials, wall panels and mechanical components from staging areas to installation points required consistent, reliable handling throughout the build schedule. 

 

Equipment Solution from HAMAC:

HAMAC supplied an HT4014 telehandler fitted with forks and a material bucket attachment to support structural lifting and bulk material handling during construction. The telehandler's 4 ton capacity and 14 m lift height allow it to place steel components and building materials at height across the facility structure.

An FD40-RT rough terrain forklift was deployed alongside the telehandler to handle ground-level transport of palletized goods, equipment crates and construction supplies. Its solid tires and rugged chassis suit the site's unpaved and debris-strewn surfaces.

Application on Site

During structural erection, the HT4014 lifts steel beams, purlins and truss sections into position for the main processing hall and storage bays, supporting the crew as they secure the framing at height.

The FD40-RT transports palletized wall panels, insulation materials and mechanical equipment from the site laydown area to installation zones, keeping construction crews supplied without delay.

As conveyor systems and sorting line components arrive on site, the telehandler positions larger modules near installation points, while the forklift handles smaller crated parts and accessories.

Both machines support ongoing yard organization, moving surplus materials, spacer blocks and packaging waste to designated areas to keep active work zones clear and safe.

Safety & Operating Practices

Operators assess load weight and dimensions before each lift, particularly for structural steel and equipment modules placed at height, adjusting attachment selection accordingly.

Given the presence of multiple trades on site, the crew maintains clear travel paths and uses spotters when moving through active construction zones or near overhead work.

Routine inspection of tyres, boom components, forks and hydraulic systems on both machines helps maintain reliable performance across the extended construction schedule.

Results & Benefits

Using the HT4014 telehandler and FD40-RT forklift together improves construction efficiency by matching each handling task to the right machine, from high-reach steel placement to ground-level material transport.

The project benefits from faster material flow between staging areas and installation points, helping keep the build on schedule despite the site's scale and complexity.

The combination of lifting reach, ground mobility and load-handling versatility supports a smoother, safer construction process for the waste sorting facility.

Need a Similar Solution?

"If you have projects with similar lifting requirements, our team can recommend the right HAMAC telehandler or forklift configuration."

Previous Post
Efficient Earthwork Solutions: Why Wheeled Excavators are the Top Choice for ...
Next Post
Why the Right Road Roller Makes All the Difference in Your Construction Project

Product Recommendation

Get in-
touch with us

Please fill out the form, and we can satisfy any of your needs including equipment selection, scheme design, technical support, or after-sales service. We will contact you as soon as possible.

WeChat QR

WeChat

WhatsApp QR

WhatsApp